PJM Queue Project AF2-021 — Battery in Ocean, New Jersey

PJM Queue Project AF2-021 — Battery in Ocean, New Jersey is a 20.0 MW battery interconnection project in Ocean, New Jersey with a current status of withdrawn. It is proposed to connect at Cedar 69 kV.

20.0 MWCapacity
WithdrawnStatus
PJMMarket
BatteryTechnology

Project facts

Canonical namePJM Queue Project AF2-021 — Battery in Ocean, New Jersey
Queue IDAF2-021
Statuswithdrawn
Source statuswithdrawn
MarketPJM
TechnologyBattery
Capacity20.0 MW
StateNew Jersey
CountyOcean
Point of interconnectionCedar 69 kV
Requested (queue) date2019-11-15
Proposed in-service date2021-06-01
Operational date
Withdrawn date2024-05-31
DeveloperCalpine Energy Services, L.P.
Utility / transmission ownerAEC

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata