PJM Queue Project AG2-300 — Battery in Frederick, Virginia

PJM Queue Project AG2-300 — Battery in Frederick, Virginia is a 100.0 MW battery interconnection project in Frederick, Virginia with a current status of active. It is proposed to connect at Meadow Brook 138 kV.

100.0 MWCapacity
ActiveStatus
PJMMarket
BatteryTechnology

Project facts

Canonical namePJM Queue Project AG2-300 — Battery in Frederick, Virginia
Queue IDAG2-300
Statusactive
Source statusactive
MarketPJM
TechnologyBattery
Capacity100.0 MW
StateVirginia
CountyFrederick
Point of interconnectionMeadow Brook 138 kV
Requested (queue) date2025-02-05
Proposed in-service date2023-12-31
Operational date
Withdrawn date
DeveloperMeadow Brook Storage, LLC
Utility / transmission ownerAPS

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.