PJM Queue Project AG2-304 — Battery in Prince William, Virginia
PJM Queue Project AG2-304 — Battery in Prince William, Virginia is a 150.0 MW battery interconnection project in Prince William, Virginia with a current status of withdrawn. It is proposed to connect at Liberty 230 kV.
150.0 MWCapacity
WithdrawnStatus
PJMMarket
BatteryTechnology
Project facts
| Canonical name | PJM Queue Project AG2-304 — Battery in Prince William, Virginia |
|---|---|
| Queue ID | AG2-304 |
| Status | withdrawn |
| Source status | withdrawn |
| Market | PJM |
| Technology | Battery |
| Capacity | 150.0 MW |
| State | Virginia |
| County | Prince William |
| Point of interconnection | Liberty 230 kV |
| Requested (queue) date | 2025-01-16 |
| Proposed in-service date | 2023-12-31 |
| Operational date | — |
| Withdrawn date | 2025-11-06 |
| Developer | Urban Grid Solar |
| Utility / transmission owner | Dominion |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata