PJM Queue Project AG2-428 — Solar+Battery in Sussex, Virginia

PJM Queue Project AG2-428 — Solar+Battery in Sussex, Virginia is a 170.0 MW solar+battery interconnection project in Sussex, Virginia with a current status of withdrawn. It is proposed to connect at Wakefield 115 kV.

170.0 MWCapacity
WithdrawnStatus
PJMMarket
Solar+BatteryTechnology

Project facts

Canonical namePJM Queue Project AG2-428 — Solar+Battery in Sussex, Virginia
Queue IDAG2-428
Statuswithdrawn
Source statuswithdrawn
MarketPJM
TechnologySolar+Battery
Capacity170.0 MW
StateVirginia
CountySussex
Point of interconnectionWakefield 115 kV
Requested (queue) date2025-02-25
Proposed in-service date2024-02-29
Operational date
Withdrawn date2025-12-02
DeveloperPeter's Bridge Solar, LLC
Utility / transmission ownerDominion

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata