PJM Queue Project AG2-447 — Solar in New Castle, Delaware
PJM Queue Project AG2-447 — Solar in New Castle, Delaware is a 20.0 MW solar interconnection project in New Castle, Delaware with a current status of active. It is proposed to connect at Cedar Creek 138 kV VII.
20.0 MWCapacity
ActiveStatus
PJMMarket
SolarTechnology
Project facts
| Canonical name | PJM Queue Project AG2-447 — Solar in New Castle, Delaware |
|---|---|
| Queue ID | AG2-447 |
| Status | active |
| Source status | active |
| Market | PJM |
| Technology | Solar |
| Capacity | 20.0 MW |
| State | Delaware |
| County | New Castle |
| Point of interconnection | Cedar Creek 138 kV VII |
| Requested (queue) date | 2025-02-25 |
| Proposed in-service date | 2024-02-01 |
| Operational date | — |
| Withdrawn date | — |
| Developer | Freepoint Solar LLC |
| Utility / transmission owner | DPL |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata