PJM Queue Project AG2-450 — Battery in Gloucester, New Jersey

PJM Queue Project AG2-450 — Battery in Gloucester, New Jersey is a 219.0 MW battery interconnection project in Gloucester, New Jersey with a current status of withdrawn. It is proposed to connect at Bridgeport 230 kV.

219.0 MWCapacity
WithdrawnStatus
PJMMarket
BatteryTechnology

Project facts

Canonical namePJM Queue Project AG2-450 — Battery in Gloucester, New Jersey
Queue IDAG2-450
Statuswithdrawn
Source statuswithdrawn
MarketPJM
TechnologyBattery
Capacity219.0 MW
StateNew Jersey
CountyGloucester
Point of interconnectionBridgeport 230 kV
Requested (queue) date2025-03-10
Proposed in-service date2025-03-01
Operational date
Withdrawn date2025-12-03
DeveloperLogan Energy Storage, L.L.C.
Utility / transmission ownerAEC

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata