PJM Queue Project AG2-451 — Battery in Salem, New Jersey

PJM Queue Project AG2-451 — Battery in Salem, New Jersey is a 240.0 MW battery interconnection project in Salem, New Jersey with a current status of withdrawn. It is proposed to connect at Chambers 230 kV.

240.0 MWCapacity
WithdrawnStatus
PJMMarket
BatteryTechnology

Project facts

Canonical namePJM Queue Project AG2-451 — Battery in Salem, New Jersey
Queue IDAG2-451
Statuswithdrawn
Source statuswithdrawn
MarketPJM
TechnologyBattery
Capacity240.0 MW
StateNew Jersey
CountySalem
Point of interconnectionChambers 230 kV
Requested (queue) date2025-03-10
Proposed in-service date2024-06-01
Operational date
Withdrawn date2025-12-03
DeveloperCarneys Point Energy Storage, L.L.C.
Utility / transmission ownerAEC

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.