PJM Queue Project AH1-165 — Battery in Will, Illinois
PJM Queue Project AH1-165 — Battery in Will, Illinois is a 72.0 MW battery interconnection project in Will, Illinois with a current status of active. It is proposed to connect at Will County 138 kV.
72.0 MWCapacity
ActiveStatus
PJMMarket
BatteryTechnology
Project facts
| Canonical name | PJM Queue Project AH1-165 — Battery in Will, Illinois |
|---|---|
| Queue ID | AH1-165 |
| Status | active |
| Source status | active |
| Market | PJM |
| Technology | Battery |
| Capacity | 72.0 MW |
| State | Illinois |
| County | Will |
| Point of interconnection | Will County 138 kV |
| Requested (queue) date | 2025-02-18 |
| Proposed in-service date | 2025-06-01 |
| Operational date | — |
| Withdrawn date | — |
| Developer | NRG Energy, Inc. |
| Utility / transmission owner | ComEd |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.