PJM Queue Project AH1-297 — Wind in Stark, Illinois

PJM Queue Project AH1-297 — Wind in Stark, Illinois is a 200.0 MW wind interconnection project in Stark, Illinois with a current status of withdrawn. It is proposed to connect at Kewanee - E.D. Edwards 138 kV.

200.0 MWCapacity
WithdrawnStatus
PJMMarket
WindTechnology

Project facts

Canonical namePJM Queue Project AH1-297 — Wind in Stark, Illinois
Queue IDAH1-297
Statuswithdrawn
Source statuswithdrawn
MarketPJM
TechnologyWind
Capacity200.0 MW
StateIllinois
CountyStark
Point of interconnectionKewanee - E.D. Edwards 138 kV
Requested (queue) date2021-09-10
Proposed in-service date2025-12-31
Operational date
Withdrawn date2025-07-03
DeveloperInvenergy
Utility / transmission ownerComEd

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata