PJM Queue Project AH1-668 — Solar in Centre, Pennsylvania

PJM Queue Project AH1-668 — Solar in Centre, Pennsylvania is a 19.9 MW solar interconnection project in Centre, Pennsylvania with a current status of withdrawn. It is proposed to connect at Madisonburg Jct-Millheim 46 kV.

19.9 MWCapacity
WithdrawnStatus
PJMMarket
SolarTechnology

Project facts

Canonical namePJM Queue Project AH1-668 — Solar in Centre, Pennsylvania
Queue IDAH1-668
Statuswithdrawn
Source statuswithdrawn
MarketPJM
TechnologySolar
Capacity19.9 MW
StatePennsylvania
CountyCentre
Point of interconnectionMadisonburg Jct-Millheim 46 kV
Requested (queue) date2020-09-29
Proposed in-service date2022-08-01
Operational date
Withdrawn date2025-03-07
DeveloperMillheim Solar I, LLC
Utility / transmission ownerAPS

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata