PJM Queue Project AH1-728 — Battery in Currituck, North Carolina

PJM Queue Project AH1-728 — Battery in Currituck, North Carolina is a 185.0 MW battery interconnection project in Currituck, North Carolina with a current status of withdrawn.

185.0 MWCapacity
WithdrawnStatus
PJMMarket
BatteryTechnology

Project facts

Canonical namePJM Queue Project AH1-728 — Battery in Currituck, North Carolina
Queue IDAH1-728
Statuswithdrawn
Source statuswithdrawn
MarketPJM
TechnologyBattery
Capacity185.0 MW
StateNorth Carolina
CountyCurrituck
Point of interconnection
Requested (queue) date
Proposed in-service date2027-11-29
Operational date
Withdrawn date2025-05-02
DeveloperVoyager BESS, LLC
Utility / transmission ownerDominion

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata