Pledger BESS (25INR0604)
Pledger BESS is a 9.5 MW other interconnection project in Matagorda, Texas with a current status of active. It is proposed to connect at 29.188382, -95.911558 CNP Pledger Substation LONG Name: PLEDGER Short Name: PG ERCOT Bus #: 43120 ERCOT Load Name: TR2 Connectivity Node: TR2.
9.5 MWCapacity
ActiveStatus
MatagordaMarket
OtherTechnology
Project facts
| Canonical name | Pledger BESS |
|---|---|
| Queue ID | 25INR0604 |
| Status | active |
| Source status | — |
| Market | Matagorda |
| Technology | Other |
| Capacity | 9.5 MW |
| State | Texas |
| County | Matagorda |
| Point of interconnection | 29.188382, -95.911558 CNP Pledger Substation LONG Name: PLEDGER Short Name: PG ERCOT Bus #: 43120 ERCOT Load Name: TR2 Connectivity Node: TR2 |
| Requested (queue) date | — |
| Proposed in-service date | 2026-11-04 |
| Operational date | — |
| Withdrawn date | — |
| Developer | Regis Pledger LLC |
| Utility / transmission owner | ERCOT |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-31 | new_project | — | active | high |
Explore related data
Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27
Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.