Poe-Suffolk 115kV is a 20.0 MW gas interconnection project in Prince George, Virginia with a current status of withdrawn.

20.0 MWCapacity
WithdrawnStatus
Market
GasTechnology

Project facts

Canonical namePoe-Suffolk 115kV
Queue IDX3-032
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyGas
Capacity20.0 MW
StateVirginia
CountyPrince George
Point of interconnection
Requested (queue) date2011-08-31
Proposed in-service date2015-06-01
Operational date
Withdrawn date2014-06-25
Developer
Utility / transmission ownerDominion

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.