POET Biorefining Lake Crystal (58197_1)

POET Biorefining Lake Crystal is a 6.0 MW other interconnection project in Blue Earth, Minnesota with a current status of operational.

6.0 MWCapacity
OperationalStatus
MISOMarket
OtherTechnology

Project facts

Canonical namePOET Biorefining Lake Crystal
Queue ID58197_1
Statusoperational
Source status(OP) Operating
MarketMISO
TechnologyOther
Capacity6.0 MW
StateMinnesota
CountyBlue Earth
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date2005-04-01
Withdrawn date—
Developer—
Utility / transmission ownerPOET Biorefining Lake Crystal

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—operationalhigh

Explore related data

Source last checked2026-10-02
Data last materially changed2026-10-02
Page data generated2026-10-12

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata