Pollo Pinto Solar (26INR0364)
Pollo Pinto Solar is a 100.6 MW solar interconnection project in Palo Pinto, Texas with a current status of operational. It is proposed to connect at Tap 138kV 331 RWMILLER - 320 JAYBIRD.
100.6 MWCapacity
OperationalStatus
Palo PintoMarket
SolarTechnology
Project facts
| Canonical name | Pollo Pinto Solar |
|---|---|
| Queue ID | 26INR0364 |
| Status | operational |
| Source status | SS Completed, FIS Completed, No IA |
| Market | Palo Pinto |
| Technology | Solar |
| Capacity | 100.6 MW |
| State | Texas |
| County | Palo Pinto |
| Point of interconnection | Tap 138kV 331 RWMILLER - 320 JAYBIRD |
| Requested (queue) date | 2024-02-27 |
| Proposed in-service date | — |
| Operational date | 2029-02-24 |
| Withdrawn date | — |
| Developer | TX Palo Pinto SB 6, LLC |
| Utility / transmission owner | ERCOT |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-09-30 | operational_date | 2027-08-15 | 2029-02-24 | medium |
| 2026-09-30 | capacity_mw | 150.8 | 100.57 | high |
| 2026-07-31 | new_project | — | operational | high |
Explore related data
Source last checked2026-09-30
Data last materially changed2026-09-30
Page data generated2026-10-11
Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.