Palo Pinto County, Texas — Interconnection Projects

The interXdata warehouse tracks 11 interconnection projects in Palo Pinto, Texas, representing 1,109 MW of requested capacity.

11Total projects
0Active
10Operational
0Withdrawn
1,109 MWRequested capacity

Technology mix

TechnologyProjectsRequested capacity
Gas5604 MW
Solar3365 MW
Battery2131 MW
Other110 MW

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
R W Miller3628_3Gas200.0 MWoperationalPalo Pinto, Texas
Pollo Pinto Solar26INR0364Solar150.8 MWoperationalPalo Pinto, Texas
Black Springs BESS24INR0315Battery120.7 MWoperationalPalo Pinto, Texas
R W Miller3628_4Gas118.8 MWoperationalPalo Pinto, Texas
R W Miller3628_5Gas118.8 MWoperationalPalo Pinto, Texas
Vault Solar25INR0482Solar108.5 MWoperationalPalo Pinto, Texas
McClure Solar21INR0509Solar105.7 MWoperationalPalo Pinto, Texas
R W Miller3628_2Gas100.0 MWoperationalPalo Pinto, Texas
R W Miller3628_1Gas66.0 MWsuspendedPalo Pinto, Texas
Mineral Wells East BESS23INR0570Other9.9 MWoperationalPalo Pinto, Texas
Mineral Wells East BESS66788_MNWLEBattery9.9 MWoperationalPalo Pinto, Texas

Top developers

Developer (canonical)ProjectsCapacity
TX Palo Pinto SB 6, LLC1151 MW
McClure Solar LLC1106 MW
Black Springs BESS LLC1121 MW
HEN Infrastructure, LLC 1110 MW
PPM THR Solar1108 MW

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); ERCOT — Generation Interconnection Status (GIS) report; Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.