Ponderay Renewable Fiber and Blockchain Center Expansion (L0511)

Ponderay Renewable Fiber and Blockchain Center Expansion is a 600.0 MW other interconnection project in Pend Oreille, Washington with a current status of withdrawn. It is proposed to connect at BPA's Usk Substation.

600.0 MWCapacity
WithdrawnStatus
WAMarket
OtherTechnology

Project facts

Canonical namePonderay Renewable Fiber and Blockchain Center Expansion
Queue IDL0511
Statuswithdrawn
Source statusWITHDRAWN
MarketWA
TechnologyOther
Capacity600.0 MW
StateWashington
CountyPend Oreille
Point of interconnectionBPA's Usk Substation
Requested (queue) date2022-01-04
Proposed in-service date2024-01-02
Operational date
Withdrawn date
DeveloperPend Oreille County PUD No. 1
Utility / transmission ownerBonneville Power Administration

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata