Port Bay ESC (24INR0280)

Port Bay ESC is a 200.0 MW battery interconnection project with a current status of withdrawn. It is proposed to connect at 8434 Rockport Substation (ROCKPORT4A) 138kV.

200.0 MWCapacity
WithdrawnStatus
ERCOTMarket
BatteryTechnology

Project facts

Canonical namePort Bay ESC
Queue ID24INR0280
Statuswithdrawn
Source statuswithdrawn
MarketERCOT
TechnologyBattery
Capacity200.0 MW
State
County
Point of interconnection8434 Rockport Substation (ROCKPORT4A) 138kV
Requested (queue) date2022-03-21
Proposed in-service date2027-06-28
Operational date
Withdrawn date2025-10-16
DeveloperFresh Air Energy II, LLC
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-28

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata