Porter Solar is a 245.8 MW solar interconnection project in Denton, Texas with a current status of operational. It is proposed to connect at tap 345kv 1429 Jacksboro - 1730 Krum West.

245.8 MWCapacity
OperationalStatus
ERCOTMarket
SolarTechnology

Project facts

Canonical namePorter Solar
Queue ID21INR0458
Statusoperational
Source statusoperational
MarketERCOT
TechnologySolar
Capacity245.8 MW
StateTexas
CountyDenton
Point of interconnectiontap 345kv 1429 Jacksboro - 1730 Krum West
Requested (queue) date2020-01-29
Proposed in-service date2024-07-31
Operational date2025-01-21
Withdrawn date
DeveloperPorter Solar, LLC
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.