Possum Point 115 kV II (AH2-059)

Possum Point 115 kV II is a 30.0 MW battery interconnection project in Prince William, Virginia with a current status of withdrawn.

30.0 MWCapacity
WithdrawnStatus
Market
BatteryTechnology

Project facts

Canonical namePossum Point 115 kV II
Queue IDAH2-059
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyBattery
Capacity30.0 MW
StateVirginia
CountyPrince William
Point of interconnection
Requested (queue) date2021-12-24
Proposed in-service date2027-12-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerDominion

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata