Possum Point 115kV (AH2-033)

Possum Point 115kV is a 60.0 MW battery interconnection project in Prince William, Virginia with a current status of withdrawn.

60.0 MWCapacity
WithdrawnStatus
—Market
BatteryTechnology

Project facts

Canonical namePossum Point 115kV
Queue IDAH2-033
Statuswithdrawn
Source statusWithdrawn
Market—
TechnologyBattery
Capacity60.0 MW
StateVirginia
CountyPrince William
Point of interconnection—
Requested (queue) date2021-11-09
Proposed in-service date2027-12-31
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerDominion

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_project—withdrawnhigh

Explore related data

Source last checked2026-10-11
Data last materially changed2026-10-11
Page data generated2026-10-11

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.