Poteet BESS (25INR0715)

Poteet BESS is a 9.9 MW battery interconnection project in Atascosa, Texas with a current status of active. It is proposed to connect at TSP Station Name: POTEET SUB TSP Station Code: POTEETS Load Name: POTEE_1 Bus#: 5710 kV: 69.

9.9 MWCapacity
ActiveStatus
ERCOTMarket
BatteryTechnology

Project facts

Canonical namePoteet BESS
Queue ID25INR0715
Statusactive
Source statusactive
MarketERCOT
TechnologyBattery
Capacity9.9 MW
StateTexas
CountyAtascosa
Point of interconnectionTSP Station Name: POTEET SUB TSP Station Code: POTEETS Load Name: POTEE_1 Bus#: 5710 kV: 69
Requested (queue) date2024-10-17
Proposed in-service date2026-01-26
Operational date
Withdrawn date
DeveloperHEN Infrastructure, LLC 1
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata