Poteet BESS (25INR0715)
Poteet BESS is a 9.9 MW battery interconnection project in Atascosa, Texas with a current status of active. It is proposed to connect at TSP Station Name: POTEET SUB TSP Station Code: POTEETS Load Name: POTEE_1 Bus#: 5710 kV: 69.
9.9 MWCapacity
ActiveStatus
ERCOTMarket
BatteryTechnology
Project facts
| Canonical name | Poteet BESS |
|---|---|
| Queue ID | 25INR0715 |
| Status | active |
| Source status | active |
| Market | ERCOT |
| Technology | Battery |
| Capacity | 9.9 MW |
| State | Texas |
| County | Atascosa |
| Point of interconnection | TSP Station Name: POTEET SUB TSP Station Code: POTEETS Load Name: POTEE_1 Bus#: 5710 kV: 69 |
| Requested (queue) date | 2024-10-17 |
| Proposed in-service date | 2026-01-26 |
| Operational date | — |
| Withdrawn date | — |
| Developer | HEN Infrastructure, LLC 1 |
| Utility / transmission owner | ERCOT |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.