Power Lane II Gas - Alternate (27INR0489)

Power Lane II Gas - Alternate is a 104.4 MW gas interconnection project in Hunt, Texas with a current status of operational. It is proposed to connect at Tap 138kV Caddo Mills Explorer (11832) – Scatter Branch Sub (1818) Line via (future) GEUS_STM Substation.

104.4 MWCapacity
OperationalStatus
HuntMarket
GasTechnology

Project facts

Canonical namePower Lane II Gas - Alternate
Queue ID27INR0489
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketHunt
TechnologyGas
Capacity104.4 MW
StateTexas
CountyHunt
Point of interconnectionTap 138kV Caddo Mills Explorer (11832) – Scatter Branch Sub (1818) Line via (future) GEUS_STM Substation
Requested (queue) date2025-06-03
Proposed in-service date—
Operational date2027-06-01
Withdrawn date—
DeveloperGEUS
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_project—operationalhigh

Explore related data

Source last checked2026-09-30
Data last materially changed2026-09-30
Page data generated2026-10-11

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata