Power Lane II Gas (27INR0489)

Power Lane II Gas is a 104.4 MW gas interconnection project in Hunt, Texas with a current status of operational. It is proposed to connect at Tap 138kV Caddo Mills Explorer (11832) – Scatter Branch Sub (1818) Line via (future) GEUS_STM Substation.

104.4 MWCapacity
OperationalStatus
HuntMarket
GasTechnology

Project facts

Canonical namePower Lane II Gas
Queue ID27INR0489
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketHunt
TechnologyGas
Capacity104.4 MW
StateTexas
CountyHunt
Point of interconnectionTap 138kV Caddo Mills Explorer (11832) – Scatter Branch Sub (1818) Line via (future) GEUS_STM Substation
Requested (queue) date2025-06-03
Proposed in-service date
Operational date2027-06-01
Withdrawn date
DeveloperGEUS
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata