Prairie Blossom Storage (27INR0323)

Prairie Blossom Storage is a 122.5 MW other interconnection project in Howard, Texas with a current status of operational. It is proposed to connect at Tap 138kV #1322 Big Spring Switch – #1366 Big Spring CRMWD.

122.5 MWCapacity
OperationalStatus
HowardMarket
OtherTechnology

Project facts

Canonical namePrairie Blossom Storage
Queue ID27INR0323
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketHoward
TechnologyOther
Capacity122.5 MW
StateTexas
CountyHoward
Point of interconnectionTap 138kV #1322 Big Spring Switch – #1366 Big Spring CRMWD
Requested (queue) date2024-12-19
Proposed in-service date—
Operational date2029-05-08
Withdrawn date—
DeveloperPrairie Blossom Storage, LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-09-30operational_date2028-09-212029-05-08medium
2026-07-31new_project—operationalhigh

Explore related data

Source last checked2026-10-30
Data last materially changed2026-10-30
Page data generated2026-11-26

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.