PJM Queue Project AH2-232 — Battery in Rockingham, Virginia

PJM Queue Project AH2-232 — Battery in Rockingham, Virginia is a 25.0 MW battery interconnection project in Rockingham, Virginia with a current status of withdrawn.

25.0 MWCapacity
WithdrawnStatus
Market
BatteryTechnology

Project facts

Canonical namePJM Queue Project AH2-232 — Battery in Rockingham, Virginia
Queue IDAH2-232
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyBattery
Capacity25.0 MW
StateVirginia
CountyRockingham
Point of interconnection
Requested (queue) date2022-03-09
Proposed in-service date2027-12-31
Operational date
Withdrawn date2022-04-15
Developer
Utility / transmission ownerDominion

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.