Prospector Energy Storage (26INR0485)

Prospector Energy Storage is a 204.6 MW other interconnection project in Howard, Texas with a current status of operational. It is proposed to connect at Natural Dam 138kV Substation (23836).

204.6 MWCapacity
OperationalStatus
HowardMarket
OtherTechnology

Project facts

Canonical nameProspector Energy Storage
Queue ID26INR0485
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketHoward
TechnologyOther
Capacity204.6 MW
StateTexas
CountyHoward
Point of interconnectionNatural Dam 138kV Substation (23836)
Requested (queue) date2024-08-16
Proposed in-service date
Operational date2026-09-30
Withdrawn date
DeveloperProspector Storage LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata