Prospero Solar*** (19INR0092)

Prospero Solar*** is a 300.0 MW solar interconnection project in Andrews, Texas with a current status of operational. It is proposed to connect at 79650 Clearfork 345kV + 10 mile gen-tie.

300.0 MWCapacity
OperationalStatus
ERCOTMarket
SolarTechnology

Project facts

Canonical nameProspero Solar***
Queue ID19INR0092
Statusoperational
Source statusoperational
MarketERCOT
TechnologySolar
Capacity300.0 MW
StateTexas
CountyAndrews
Point of interconnection79650 Clearfork 345kV + 10 mile gen-tie
Requested (queue) date2017-06-22
Proposed in-service date2020-06-30
Operational date2020-06-30
Withdrawn date
DeveloperLongroad Energy
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.