Pumpjack Solar I (59322_GEN1)

Pumpjack Solar I is a 20.0 MW solar interconnection project in Kern, California with a current status of operational.

20.0 MWCapacity
OperationalStatus
CISOMarket
SolarTechnology

Project facts

Canonical namePumpjack Solar I
Queue ID59322_GEN1
Statusoperational
Source status(OP) Operating
MarketCISO
TechnologySolar
Capacity20.0 MW
StateCalifornia
CountyKern
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date2015-01-01
Withdrawn date—
Developer—
Utility / transmission ownerDeriva Energy

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—operationalhigh

Explore related data

Source last checked2026-10-02
Data last materially changed2026-10-02
Page data generated2026-10-11

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata