Quarter Horse Solar (24INR0053)

Quarter Horse Solar is a 204.1 MW solar interconnection project in Bee, Texas with a current status of withdrawn. It is proposed to connect at tap 345kV 8689 Tango - 8606 Goddard.

204.1 MWCapacity
WithdrawnStatus
ERCOTMarket
SolarTechnology

Project facts

Canonical nameQuarter Horse Solar
Queue ID24INR0053
Statuswithdrawn
Source statuswithdrawn
MarketERCOT
TechnologySolar
Capacity204.1 MW
StateTexas
CountyBee
Point of interconnectiontap 345kV 8689 Tango - 8606 Goddard
Requested (queue) date2021-05-05
Proposed in-service date2024-07-31
Operational date
Withdrawn date2023-04-24
DeveloperQuarter Horse Solar, LLC
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata