Quinto Solar PV Project (59339_SSC13)

Quinto Solar PV Project is a 108.0 MW solar interconnection project in Merced, California with a current status of operational.

108.0 MWCapacity
OperationalStatus
CISOMarket
SolarTechnology

Project facts

Canonical nameQuinto Solar PV Project
Queue ID59339_SSC13
Statusoperational
Source status(OP) Operating
MarketCISO
TechnologySolar
Capacity108.0 MW
StateCalifornia
CountyMerced
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date2015-11-01
Withdrawn date—
Developer—
Utility / transmission ownerArevon Energy, Inc.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—operationalhigh

Explore related data

Source last checked2026-10-02
Data last materially changed2026-10-02
Page data generated2026-10-11

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.