Rambler Solar (19INR0114)

Rambler Solar is a 200.0 MW solar interconnection project in Tom Green, Texas with a current status of operational. It is proposed to connect at 76009 Twin Buttes 345kV.

200.0 MWCapacity
OperationalStatus
ERCOTMarket
SolarTechnology

Project facts

Canonical nameRambler Solar
Queue ID19INR0114
Statusoperational
Source statusoperational
MarketERCOT
TechnologySolar
Capacity200.0 MW
StateTexas
CountyTom Green
Point of interconnection76009 Twin Buttes 345kV
Requested (queue) date2017-08-08
Proposed in-service date2020-09-18
Operational date2020-10-01
Withdrawn date
DeveloperRambler Solar
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata