Ratliff (Concho Valley) Solar (21INR0384)
Ratliff (Concho Valley) Solar is a 159.8 MW solar interconnection project in Tom Green, Texas with a current status of operational. It is proposed to connect at The crossing of SAPS to Live Oak and SAPS to Yellowjacket 138 kV lines..
159.8 MWCapacity
OperationalStatus
ERCOTMarket
SolarTechnology
Project facts
| Canonical name | Ratliff (Concho Valley) Solar |
|---|---|
| Queue ID | 21INR0384 |
| Status | operational |
| Source status | operational |
| Market | ERCOT |
| Technology | Solar |
| Capacity | 159.8 MW |
| State | Texas |
| County | Tom Green |
| Point of interconnection | The crossing of SAPS to Live Oak and SAPS to Yellowjacket 138 kV lines. |
| Requested (queue) date | 2019-07-07 |
| Proposed in-service date | 2023-05-26 |
| Operational date | 2023-05-25 |
| Withdrawn date | — |
| Developer | MERIT SI DEVELOPMENT, LLC |
| Utility / transmission owner | ERCOT |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.