Ratliff (Concho Valley) Solar is a 159.8 MW solar interconnection project in Tom Green, Texas with a current status of operational. It is proposed to connect at The crossing of SAPS to Live Oak and SAPS to Yellowjacket 138 kV lines..

159.8 MWCapacity
OperationalStatus
ERCOTMarket
SolarTechnology

Project facts

Canonical nameRatliff (Concho Valley) Solar
Queue ID21INR0384
Statusoperational
Source statusoperational
MarketERCOT
TechnologySolar
Capacity159.8 MW
StateTexas
CountyTom Green
Point of interconnectionThe crossing of SAPS to Live Oak and SAPS to Yellowjacket 138 kV lines.
Requested (queue) date2019-07-07
Proposed in-service date2023-05-26
Operational date2023-05-25
Withdrawn date
DeveloperMERIT SI DEVELOPMENT, LLC
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.