Rawlings-Clover 500 kV (AG2-580 - moved to TC2)

Rawlings-Clover 500 kV is a 150.0 MW solar interconnection project in Brunswick, Virginia with a current status of withdrawn.

150.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameRawlings-Clover 500 kV
Queue IDAG2-580 - moved to TC2
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity150.0 MW
StateVirginia
CountyBrunswick
Point of interconnection
Requested (queue) date2021-01-29
Proposed in-service date2024-10-01
Operational date
Withdrawn date2025-03-06
Developer
Utility / transmission ownerDominion

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata