Raystown-Lewistown 230kV (Y2-087)

Raystown-Lewistown 230kV is a 150.4 MW wind interconnection project in Mifflin, Pennsylvania with a current status of withdrawn.

150.4 MWCapacity
WithdrawnStatus
—Market
WindTechnology

Project facts

Canonical nameRaystown-Lewistown 230kV
Queue IDY2-087
Statuswithdrawn
Source statusWithdrawn
Market—
TechnologyWind
Capacity150.4 MW
StatePennsylvania
CountyMifflin
Point of interconnection—
Requested (queue) date2012-10-31
Proposed in-service date2016-10-31
Operational date—
Withdrawn date2014-08-28
Developer—
Utility / transmission ownerPENELEC

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_project—withdrawnhigh

Explore related data

Source last checked2026-10-11
Data last materially changed2026-10-11
Page data generated2026-10-11

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata