RC Thomas Hydroelectric Project (58645_RCT1)

RC Thomas Hydroelectric Project is a 8.9 MW other interconnection project in Polk, Texas with a current status of operational.

8.9 MWCapacity
OperationalStatus
MISOMarket
OtherTechnology

Project facts

Canonical nameRC Thomas Hydroelectric Project
Queue ID58645_RCT1
Statusoperational
Source status(OP) Operating
MarketMISO
TechnologyOther
Capacity8.9 MW
StateTexas
CountyPolk
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date2020-07-01
Withdrawn date
Developer
Utility / transmission ownerEast Texas Electric Coop, Inc

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata