Red Eye 138 kV (AH1-352 - moved to TC2)

Red Eye 138 kV is a 40.0 MW battery interconnection project in Campbell, Virginia with a current status of withdrawn.

40.0 MWCapacity
WithdrawnStatus
Market
BatteryTechnology

Project facts

Canonical nameRed Eye 138 kV
Queue IDAH1-352 - moved to TC2
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyBattery
Capacity40.0 MW
StateVirginia
CountyCampbell
Point of interconnection
Requested (queue) date2021-09-10
Proposed in-service date2023-09-30
Operational date
Withdrawn date2025-03-28
Developer
Utility / transmission ownerAEP

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.