Red Holly Storage 1 (21INR0029)

Red Holly Storage 1 is a 50.0 MW other interconnection project in Dawson, Texas with a current status of operational. It is proposed to connect at tap 345kV 59900 Longdraw - 79641 Farmland.

50.0 MWCapacity
OperationalStatus
DawsonMarket
OtherTechnology

Project facts

Canonical nameRed Holly Storage 1
Queue ID21INR0029
Statusoperational
Source statusSS Completed, FIS Started, IA
MarketDawson
TechnologyOther
Capacity50.0 MW
StateTexas
CountyDawson
Point of interconnectiontap 345kV 59900 Longdraw - 79641 Farmland
Requested (queue) date2018-07-11
Proposed in-service date
Operational date2028-05-30
Withdrawn date
DeveloperGreenGo Energy
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata