Red Mud Creek (20INR0038)

Red Mud Creek is a 201.0 MW wind interconnection project in Borden, Texas with a current status of withdrawn. It is proposed to connect at tap 345kV 11318 Scurry - 59905 Faraday or 11318-59900 Long Draw.

201.0 MWCapacity
WithdrawnStatus
ERCOTMarket
WindTechnology

Project facts

Canonical nameRed Mud Creek
Queue ID20INR0038
Statuswithdrawn
Source statuswithdrawn
MarketERCOT
TechnologyWind
Capacity201.0 MW
StateTexas
CountyBorden
Point of interconnectiontap 345kV 11318 Scurry - 59905 Faraday or 11318-59900 Long Draw
Requested (queue) date2017-11-28
Proposed in-service date2024-12-12
Operational date
Withdrawn date2023-03-29
DeveloperRWE Solar Development, LLC
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata