Redding Tech West (23INR0320)
Redding Tech West is a 130.0 MW gas interconnection project in Ector, Texas with a current status of withdrawn. It is proposed to connect at 1250 Yukon 138kV.
130.0 MWCapacity
WithdrawnStatus
ERCOTMarket
GasTechnology
Project facts
| Canonical name | Redding Tech West |
|---|---|
| Queue ID | 23INR0320 |
| Status | withdrawn |
| Source status | withdrawn |
| Market | ERCOT |
| Technology | Gas |
| Capacity | 130.0 MW |
| State | Texas |
| County | Ector |
| Point of interconnection | 1250 Yukon 138kV |
| Requested (queue) date | 2021-08-31 |
| Proposed in-service date | 2024-07-01 |
| Operational date | — |
| Withdrawn date | 2022-10-07 |
| Developer | Redding Tech West |
| Utility / transmission owner | ERCOT |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.