Reforzar Bess 2 (27INR0401)

Reforzar Bess 2 is a 207.6 MW other interconnection project in Brooks, Texas with a current status of operational. It is proposed to connect at 345 kV 80078 Reforzar.

207.6 MWCapacity
OperationalStatus
BrooksMarket
OtherTechnology

Project facts

Canonical nameReforzar Bess 2
Queue ID27INR0401
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketBrooks
TechnologyOther
Capacity207.6 MW
StateTexas
CountyBrooks
Point of interconnection345 kV 80078 Reforzar
Requested (queue) date2024-12-19
Proposed in-service date
Operational date2028-04-13
Withdrawn date
DeveloperTempus Power management LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.