Brooks County, Texas — Interconnection Projects
The interXdata warehouse tracks 9 interconnection projects in Brooks, Texas, representing 929 MW of requested capacity.
9Total projects
0Active
9Operational
0Withdrawn
929 MWRequested capacity
Technology mix
| Technology | Projects | Requested capacity |
|---|---|---|
| Solar | 3 | 474 MW |
| Other | 3 | 425 MW |
| Battery | 3 | 30 MW |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| Verily Solar (FKA Cuello De Cuero Solar) | 28INR0059 | Solar | 261.0 MW | operational | Brooks, Texas |
| Reforzar Bess 2 | 27INR0401 | Other | 207.6 MW | operational | Brooks, Texas |
| Reforzar BESS 1 | 27INR0400 | Other | 207.6 MW | operational | Brooks, Texas |
| Kinenos Solar | 23INR0087 | Solar | 203.2 MW | operational | Brooks, Texas |
| Alexis Solar, LLC | 64227_12001 | Solar | 10.0 MW | operational | Brooks, Texas |
| Falfurrias BESS | 66792_FALFU | Battery | 9.9 MW | operational | Brooks, Texas |
| Regis Falfurrias | 69349_FALFU | Battery | 9.9 MW | operational | Brooks, Texas |
| Falfurrias BESS | 23INR0620 | Other | 9.9 MW | operational | Brooks, Texas |
| Falfur BESS | 24INR0593 | Battery | 9.8 MW | operational | Brooks, Texas |
Top developers
| Developer (canonical) | Projects | Capacity |
|---|---|---|
| Tempus Power management LLC | 2 | 415 MW |
| Verily Solar, LLC | 1 | 261 MW |
| Encino del Sol Energy, LLC | 1 | 203 MW |
| Regis Falfurrias LLC | 1 | 10 MW |
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); ERCOT — Generation Interconnection Status (GIS) report; Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Get an alert when a new project is proposed in Brooks County.
Start tracking with interXdata