Remy Jade Power Station (23INR0339)

Remy Jade Power Station is a 306.0 MW gas interconnection project in Harris, Texas with a current status of operational. It is proposed to connect at Tap 138 kV line from Crosby (#40390) to Highlands (#40811).

306.0 MWCapacity
OperationalStatus
ERCOTMarket
GasTechnology

Project facts

Canonical nameRemy Jade Power Station
Queue ID23INR0339
Statusoperational
Source statusoperational
MarketERCOT
TechnologyGas
Capacity306.0 MW
StateTexas
CountyHarris
Point of interconnectionTap 138 kV line from Crosby (#40390) to Highlands (#40811)
Requested (queue) date2021-08-23
Proposed in-service date2024-07-12
Operational date2024-05-14
Withdrawn date
DeveloperRemy Jade III Generating, LLC
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata