Reynolds 345KV substation (S1003)

Reynolds 345KV substation is a 55.0 MW generation interconnection project in White, Indiana with a current status of withdrawn. It is proposed to connect at Reynolds 345KV substation.

55.0 MWCapacity
WithdrawnStatus
Market
GenerationTechnology

Project facts

Canonical nameReynolds 345KV substation
Queue IDS1003
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyGeneration
Capacity55.0 MW
StateIndiana
CountyWhite
Point of interconnectionReynolds 345KV substation
Requested (queue) date2020-11-06
Proposed in-service date
Operational date
Withdrawn date2021-02-10
Developer
Utility / transmission ownerNORTHERN INDIANA PUBLIC SERVICE COMPANY

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata