Richland Solar Center (59874_PV1)

Richland Solar Center is a 20.0 MW solar interconnection project in Twiggs, Georgia with a current status of operational.

20.0 MWCapacity
OperationalStatus
SEPAMarket
SolarTechnology

Project facts

Canonical nameRichland Solar Center
Queue ID59874_PV1
Statusoperational
Source status(OP) Operating
MarketSEPA
TechnologySolar
Capacity20.0 MW
StateGeorgia
CountyTwiggs
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date2015-12-01
Withdrawn date
Developer
Utility / transmission ownerOnward Energy

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-28

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata