Twiggs County, Georgia — Interconnection Projects
The interXdata warehouse tracks 4 interconnection projects in Twiggs, Georgia, representing 227 MW of requested capacity.
4Total projects
0Active
4Operational
0Withdrawn
227 MWRequested capacity
Technology mix
| Technology | Projects | Requested capacity |
|---|---|---|
| Solar | 2 | 224 MW |
| Gas | 2 | 3 MW |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| Twiggs Solar | 61696_TWIGG | Solar | 204.0 MW | operational | Twiggs, Georgia |
| Richland Solar Center | 59874_PV1 | Solar | 20.0 MW | operational | Twiggs, Georgia |
| ADS Renewable Energy-Wolf Creek LLC | 60184_GEN1 | Gas | 1.4 MW | operational | Twiggs, Georgia |
| ADS Renewable Energy-Wolf Creek LLC | 60184_GEN2 | Gas | 1.4 MW | operational | Twiggs, Georgia |
Top developers
Developer attribution is not yet resolved for this set.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Get an alert when a new project is proposed in Twiggs County.
Start tracking with interXdata