Riders Creek 115kV (Y3-031)

Riders Creek 115kV is a 130.9 MW wind interconnection project in Tyrell, North Carolina with a current status of withdrawn.

130.9 MWCapacity
WithdrawnStatus
Market
WindTechnology

Project facts

Canonical nameRiders Creek 115kV
Queue IDY3-031
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyWind
Capacity130.9 MW
StateNorth Carolina
CountyTyrell
Point of interconnection
Requested (queue) date2013-02-06
Proposed in-service date2016-10-31
Operational date
Withdrawn date2013-09-16
Developer
Utility / transmission ownerDominion

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-28

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.