Rio Grand Valley Element Fuels Power (26INR0515)

Rio Grand Valley Element Fuels Power is a 79.6 MW other interconnection project in Cameron, Texas with a current status of operational. It is proposed to connect at Tap 138kV 59450 Waterport Substation - 5789 Southmost Sub.

79.6 MWCapacity
OperationalStatus
CameronMarket
OtherTechnology

Project facts

Canonical nameRio Grand Valley Element Fuels Power
Queue ID26INR0515
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketCameron
TechnologyOther
Capacity79.6 MW
StateTexas
CountyCameron
Point of interconnectionTap 138kV 59450 Waterport Substation - 5789 Southmost Sub
Requested (queue) date2024-06-13
Proposed in-service date
Operational date2028-12-05
Withdrawn date
DeveloperElement H2Gen, LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata