Rio Grande 12kV (W3-058)

Rio Grande 12kV is a 10.0 MW solar interconnection project in Cape May, New Jersey with a current status of withdrawn.

10.0 MWCapacity
WithdrawnStatus
—Market
SolarTechnology

Project facts

Canonical nameRio Grande 12kV
Queue IDW3-058
Statuswithdrawn
Source statusWithdrawn
Market—
TechnologySolar
Capacity10.0 MW
StateNew Jersey
CountyCape May
Point of interconnection—
Requested (queue) date2010-09-10
Proposed in-service date2012-07-01
Operational date—
Withdrawn date2013-07-24
Developer—
Utility / transmission ownerAEC

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_project—withdrawnhigh

Explore related data

Source last checked2026-10-12
Data last materially changed2026-10-12
Page data generated2026-10-12

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.