Rising Paladin Solar Farm (IC-270)

Rising Paladin Solar Farm is a 20.0 MW solar interconnection project in Early County, Georgia with a current status of operational.

20.0 MWCapacity
OperationalStatus
GAMarket
SolarTechnology

Project facts

Canonical nameRising Paladin Solar Farm
Queue IDIC-270
Statusoperational
Source status
MarketGA
TechnologySolar
Capacity20.0 MW
StateGeorgia
CountyEarly County
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date
Withdrawn date
Developer
Utility / transmission ownerGeorgia Power

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.